seilbahn.net | Projects | Current | 2022-08-31

LEITNER: 3 in 1 with the Telemix at Rittisberg-Austria

This year the old 4-seater chairlift built in 1998 will be replaced by the TMX 6-10 "Rittisbergbahn" at the beginning of the 2022/2023 winter season. The Pininfarina-designed combination of detachable chairlift and gondola lift will increase the transport capacity up to 2300 p/h at a speed of 5 m/s. The travel time will also be halved after this investment - it will only takes around 3 minutes to go up to the top station. The premium system at Erlebnis Rittisberg is equipped with:

LEITNER Premium Station
LEITNER Premium Chair EVO
LEITNER Premium Cabin Diamond EVO







Zurück
Fotos hinzufügen
Drucken
Email


Google Adsense